

Components
Apple still has nothing to replace the most powerful Intel processors? New Mac Pro and iMac Pro delayed until next year
Despite the abundance of rumors, today Apple may not introduce the new Mac Pro and iMac Pro. What’s more, those PCs could be delayed until next year.
This was announced by well-known analyst Ming-Chi Kuo. According to his data, the Cupertino giant will introduce new generations of iMac Pro and Mac Pro in 2023, and this year we are waiting for a new and more powerful Mac mini, as well as a more affordable Apple monitor with a 27-inch screen and without Mini-LED.
Recall that we talked about the new Mac mini called Mac Studio, as well as the same 27-inch monitor yesterday. We also saw renderings of these devices.
As for the new Mac Pro and iMac Pro, if they are indeed delayed by another year or more, it’s safe to assume that they will get much more powerful platforms than the current M1 Pro and M1 Max. Perhaps due to the need to make professional PCs more powerful, Apple will wait until 2023.
.

Components
Intel’s recent statement was misinterpreted. There will still be no full-fledged Meteor Lake-S desktop processors

Intel seems to have decided to confuse the public with its plans for the desktop processor segment. It turns out that there will still be no full-fledged desktop models of Meteor Lake-S.
Yes, Intel executive vice president and general manager of the client computing group Michelle Johnston Holthaus said just the day before yesterday that such CPUs would be released in 2024, which raised questions about three lines at once in one year. However, it now turns out that Holthaus did not actually mean the desktop segment in the form in which it is usually understood. Meteor Lake processors will indeed appear in desktop PCs, but this does not mean that such CPUs can be purchased separately and assembled into a computer based on them. In fact, Meteor Lake-S in the desktop segment will only be available in all-in-one PCs.
Meteor Lake is a power-efficient architecture that will power innovative mobile and desktop designs, including desktop form factors such as All-in-One (AIO). We will share more details about the product in the future
Intel
Intel already has experience releasing core KB desktop processors, which were only available in mini-PCs. Apparently, it will be the same story with Meteor Lake-S. Moreover, it is likely that technically these processors will completely copy mobile versions, except that the TDP may be higher.
That is, in 2024 we will have only two desktop lines: Raptor Lake Refresh, which will be released in October of this year, and then Arrow Lake-S sometime next year.
Components
The GeForce RTX 5090 will not repeat the fate of the fire-hazardous RTX 4090. Tests of the 12V-2×6 power connector showed that it works even when connected incompletely

Back in July, we learned that Nvidia was working on a replacement for the fire-hazardous 12VHPWR connector. And now the first tests of the 12V-2×6 connector have appeared on the Internet, which should replace the 12VHPWR.
The authors of the HardwareBusters channel visited the laboratory of Linewell, which produces power cables, including for video card manufacturers.
Linewell tested the cable with the new connector, and tested it in a format that simulated the most common cause of 12VHPWR melting. At first, Linewell specialists tested it in normal mode for almost an hour, and the connector only heated up to 46.5 degrees. Then the cable was not connected completely, which usually leads to melting, and a power of more than 640 W was applied to it, that is, exceeding the established limit of 600 W. The connector passed the test, heating up to only 41 degrees.
Components
Intel wants a “five-year plan” in a year? Next year the company will have three lines of desktop processors at once, as Meteor Lake-S will still be released

Intel seems to have decided to exceed the plan not only in terms of technical processes, but also in terms of CPU lines. It turns out that Meteor Lake-S desktop processors will still be released.
Michelle Johnston Holthaus, Intel executive vice president and general manager of the client computing group, spoke about this. The PC World journalist, apparently not expecting an affirmative answer to his question regarding the fate of Meteor Lake-S, even asked again, and again received an affirmative answer.
So, tabletop Meteor Lake will still be released, and will be released next year. But now it’s not very clear how Intel is going to launch three lines at once within one year. Let us remind you that Raptor Lake Refresh will be released in October, and Arrow Lake is also expected next year. And if previously it was believed that the latter would simply replace the former, now another line is being added to them.
Perhaps Meteor Lake and Arrow Lake will coexist in the same way as in the mobile segment: Intel said that the former will occupy the mid-price segment, and the latter will be available in the upper price segment. And if these lines are released on desktop at the end of 2024, then they will together replace Raptor Lake Refresh. However, such a division will still be unusual, and Intel itself promised to release ARROW Lake much earlier than at the end of next year.
-
Phones5 days ago
Are there a lot of defects in the new iPhone 15? People are sharing photos of poor quality paint and assembly
-
Electric Cars5 days ago
Noisy, windy and with turbo lag. The newest crossover Lexus TX 2024 passed its first test drive a few weeks before the start of sales
-
News3 days ago
BelAZ presented super-new products: a 130-ton hydrogen dump truck and a 200-ton hydraulic excavator
-
Electric Cars6 days ago
OLED 2K screen, 5200 mAh, 66 W, three 50-megapixel sensors, IP68 and Snapdragon 8 Gen 2. Nio Phone introduced – the first car smartphone